Government Solar Policies, Subsidies & Schemes
In-depth analysis of PM Surya Ghar Muft Bijli Yojana, PM-KUSUM agricultural solar, state-wise rooftop subsidies, DISCOM net metering mandates, and ALMM list mandates.

Central Subsidy Cap
₹78,000 CFA
States Covered
All 28 States
Accelerated Depr.
40% 1st Year
ALMM Mandate
100% Empaneled
PM Surya Ghar
Central Rooftop Subsidy Scheme
PM-KUSUM
Agricultural Feeder Solarization
ALMM Approved
Mandatory Indian Module Standards
Group Net Metering
Community Solar Billing Framework
State Solar Subsidy & Rules Checker
Select your state and proposed solar capacity to calculate central CFA + state top-up subsidy amounts.
In-Depth Subsidy & Policy Analysis
PM Surya Ghar 2026 Central Subsidy Matrix
Step-by-step calculation breakdown for ₹30k (1kW), ₹60k (2kW), and ₹78k (3kW+) subsidy disbursements.
ALMM Order Update: Domestic Content Requirement
Impact of mandatory Approved List of Models & Manufacturers on solar cell import tariffs and project costs.
Government Policy Handbooks
Frequently Asked Questions
How long does it take for the central subsidy to be credited?
Once net metering is completed and inspection is uploaded to the National Portal, the subsidy is credited directly to the applicant bank account within 30 days.
Can commercial buildings claim PM Surya Ghar subsidy?
No, PM Surya Ghar is specifically for residential rooftop installations. Commercial buildings benefit from Accelerated Depreciation (40%) and GST input credits.
