Gorakhpur Solar Energy & UPVCL Net Metering
Complete rooftop solar guide for Gorakhpur homes, hospitals, and educational institutions with UPVCL Eastern DISCOM net metering and PM Surya Ghar subsidies.

Solar Irradiance
5.0 kWh/m²/day
DISCOM Utility
UPVCL
Combined Subsidy
₹93,000
Est. Payback
4.1 Years
₹6.80/unit
Domestic UPVCL Tariff
295 Days
Annual Sun Exposure
UP NEDA
State Nodal Approval
100% DBT
Direct Bank Transfer
Gorakhpur Solar Subsidy & Yield Estimator
Calculate rooftop system pricing, subsidy eligibility, and payback period for Gorakhpur.
Turnkey Capital Cost
₹180,000
Total Subsidy
₹93,000
Est. Annual Savings
₹28,560/yr
Payback Period
3.0 Years
Gorakhpur Solar Highlights
UPVCL Net Metering
Export surplus daytime generation back to UPVCL Eastern DISCOM grid and receive monthly bill offset credits.
Institutional & Healthcare
Tailored solar-plus-storage solutions for hospitals and universities in Gorakhpur to guarantee 24/7 power backup.
UP State Subsidy Top-up
Claim ₹15,000 additional UP NEDA state incentive credited directly to residential home solar accounts.
Gorakhpur Resources
Frequently Asked Questions
What is the process to apply for UPVCL net metering in Gorakhpur?
Submit the online feasibility application on the UP DISCOM portal, complete physical installation with an empanelled vendor, and request DISCOM meter testing.
Are high-wind mounting structures required in Gorakhpur?
Yes! Elevated aluminum/galvanized iron mounting structures designed for 150 km/h wind loads are standard for Gorakhpur installations.
