Greater Noida Smart Solar Energy Portal
Industrial solar microgrids, NPCL smart net metering, Knowledge Park campus solar solutions, and green building incentives across Greater Noida.

Solar Irradiance
5.4 kWh/m²/day
DISCOM Utility
NPCL
Net Metering Approval
10-15 Days
Est. Payback
3.5 Years
₹8.40/unit
NPCL Industrial Grid Tariff
Smart Grid
NPCL Bi-Directional Metering
310 Days
Annual Sun Coverage
Open Access
MW-Scale Solar Available
Greater Noida Industrial & Campus Estimator
Calculate rooftop solar ROI and NPCL tariff offset for Knowledge Park educational campuses or Ecotech industrial zones.
Turnkey Capital Cost
₹295,000
Eligible Subsidy
₹0
Est. Annual Savings
₹62,160/yr
Payback Period
4.7 Years
Greater Noida Smart City Features
NPCL Digital Net Metering
Noida Power Company Limited (NPCL) offers digital single-window net metering approvals within 10-15 business days.
Knowledge Park Campuses
Large-scale rooftop PV installations for engineering colleges and university campuses to drastically cut institutional power overheads.
Ecotech Industrial Parks
High-capacity solar setups for electronics manufacturing units along the Greater Noida Expressway with open access options.
Greater Noida Documents
Frequently Asked Questions
Is NPCL net metering available for Greater Noida industrial plots?
Yes, NPCL approves rooftop net metering up to 100% of sanctioned load for industrial and commercial consumers.
What is the average payback period for Knowledge Park campus installations?
University campuses typically achieve full payback within 3.2 to 3.5 years due to high daytime consumption matching peak solar output.